Beryl Phillips Reserve Wetland, Mount Evelyn

  • Project typeWetland
  • Project value$300,000
  • Project scheduleTender
  • Contractor nameTo be confirmed
Beryl-Philips-Wetland-Pre-Construction-Image-1.png

 

Yarra Ranges Council is planning construction of a new wetland within Beryl Phillips Nature Reserve, Mount Evelyn, near the intersection of Stubbs Avenue and Louisa Street.

The project will help manage stormwater entering the reserve from the existing Stubbs Avenue stormwater outlet. Currently, concentrated stormwater flows are contributing to erosion of the embankment and downstream gully. The project is partly funded by Melbourne Water through the Liveable Communities, Liveable Waterways program, in partnership with Yarra Ranges Council.

What we are doing

 Construction of a new wetland system within Beryl Phillips Nature Reserve including:

  • earthworks to form wetland ponds and drainage zones
  • modification of the existing Stubbs Avenue stormwater outlet
  • installation of new drainage pipework and a reinforced concrete sump pit
  • construction of concrete overflow weirs
  • installation of rock protection, rock-lined overflow areas and stabilised flow paths
  • placement of topsoil and hydroseeding of disturbed areas
  • installation of maintenance tracks and reinstatement disturbed areas after construction
  • protection of retained vegetation and existing assets during the works

How the project will help

The wetland is intended to improve the existing drainage conditions by:

  • intercepting stormwater before it reaches the eroded embankment
  • slowing stormwater flows through the reserve
  • reducing erosion risk
  • improving stormwater quality
  • providing detention and infiltration where practical
  • dispersing overflow through more stable drainage paths
  • reducing downstream impacts before flows continue toward the Fuller Road drainage network
  • approaches and reinstatement of gravel paths and disturbed areas

What to expect during construction

Works are anticipated to commence in February 2027 and be completed in June 2027.  The works are located within a public reserve and will require careful management of access, public safety, vegetation, erosion, sediment and environmental risks.

During construction, residents and reserve users may notice:

  • temporary fencing and signage
  • construction vehicles and machinery
  • temporary access arrangements within the reserve
  • noise, dust and vibration at times
  • changed pedestrian access near the work area
  • temporary disturbance to some areas of the reserve

Council and its contractor will work to minimise disruption where practical and reinstate disturbed areas after construction.